Buildings

The Offsite Solution

The construction industry is evolving as the availability of labour is falling yet the requirement for speed and volume is increasing. Manufacturing offsite is forging the way for faster, safer and more efficient building construction.

It has been shown that using a precast solution instead of traditional in-situ can lead to a reduction of up to 60% of manpower required on site and a reduction of up to 30% in construction time.

Banagher Precast Concrete offsite precast solutions include but are not limited to precast stairs, flooring, walls, stair cores, double tees, beams, façade panels and architectural precast. We have even manufactured columns up to 24 m high which require no temporary propping on site.

Where we also stand apart from other precast manufacturers is with our unique Banagher Double Tee floor/roof beams – our double tees can span up to 30 m and have been implemented in buildings, multi-storey car parks and more frequently in reservoirs, swimming pools and sports facilities where long spans are required.

Accredited with ISO9001, ISO14001, CE Marking, EN206 you can be assured that all precast concrete elements designed, manufactured and installed by Banagher Precast Concrete are manufactured to the highest quality standards.

We understand that no two buildings are the same and we offer our clients flexibility as we embrace Design for Manufacture and Assembly (DfMA). We can also provide a tailor made value engineering solution to change an in-situ building design to precast, the earlier we’re involved in a project the more of an impact we can make – talk to us.